General Announcement::Canacol Energy Ltd. Announces Discoveries at Dividivi 1, Saxofon 1, and Chimela 1

Issuer & Securities

Issuer/ Manager
CANACOL ENERGY LTD.
Securities
CANACOLENE US$500M5.75%281124A - US134808AD63 - PNTB
CANACOLENE US$500M5.75%281124R - USU13518AC64 - YW0B
Stapled Security
No

Announcement Details

Announcement Title
General Announcement
Date &Time of Broadcast
23-Jan-2023 20:03:26
Status
New
Announcement Sub Title
Canacol Energy Ltd. Announces Discoveries at Dividivi 1, Saxofon 1, and Chimela 1
Announcement Reference
SG230123OTHRU6LJ
Submitted By (Co./ Ind. Name)
SGX-SE
Designation
SGX-SE
Description (Please provide a detailed description of the event in the box below)
Canacol Energy Ltd. Announces Discoveries at Dividivi 1, Saxofon 1, and Chimela 1

CALGARY, ALBERTA (January 23, 2023) - Canacol Energy Ltd. ("Canacol" or the "Corporation") (TSX:CNE; OTCQX:CNNEF; BVC:CNEC) is pleased to provide details on the following three discoveries, as well as information concerning its near term drilling programs.

Saxofon 1 Encounters 338 feet of gross gas pay within the Porquero and CDO reservoirs

The Corporation commenced the drilling of the Saxofon 1 exploration well on December 2, 2022 on its 100% operated VIM5 Exploration and Production ( E&P ) contract located in the Lower Magdalena Basin. The well reached a total depth of 9,416 feet measured depth ( ft md ) on January 7, 2023 and encountered a gross gas column of 290 feet true vertical depth ( ft tvd ) within the Porquero sandstone reservoir between depths of 4,385 and 4,675 ft md, and a gross gas column of 48 ft tvd within the primary Cienaga de Oro ( CDO ) sandstone reservoir between 7,560 and 7,608 ft md.

The gas bearing reservoirs encountered within the Porquero sandstone display average porosity of 26 %, while those within the CDO sandstone display average porosity of 16 %.

The well is currently being cased, and the Corporation is planning to mobilize a workover rig to complete and test the CDO. The development plan for Saxofon will include the drilling of additional appraisal and development wells once a new 3D seismic survey has been acquired over that area of the block in late 2023.

The Corporation will provide production test results when they become available.

Attachments